Then I looked at how houses get costed and found the discipline was not there. arko exists to move it across.
With major contractors, on projects where that package is the largest single line in the budget.
Much of that on the estimating side. Building bids, pricing variations, and working out what the same design costs when it is built three different ways in three different products. That is what arko does, pointed at houses instead of offices.
I also grew up in a family steel business, where nobody drew anything without knowing what it cost to make.
From £1,800. Four questions to start. We come back within two days.
Nobody gave them a number to draw against. The supplier holds the price, the architect holds the drawing, and until tender the two never meet.
arko is the bridge between them. The room that never existed before.
Two weeks from the drawings you already have.
Would a supplier price a specification months before an order? We put that to eleven of them in a single day at the Homebuilding & Renovating Show in Edinburgh.
said they would price a specification at design stage. Not one refused.
the range of how long they said they would hold that price.
described the same failure. By tender, the decision has already been made.
Those eleven are where the list started. Every plan since is priced against named firms who have already said they will quote at design stage, and a record of how long each of them holds a figure.
No platform. The tools architects and suppliers will work in are the next thing, and they come when the method is proven rather than before.
Ten years of pricing envelopes commercially. A supplier network that will put a figure to a drawing rather than an order, a record of who prices what and for how long, and a method run against real buildings for a decade on the commercial side.
Everything else is the work of making it true. Pick the door that fits.
What your project actually costs, while the drawings can still change.
See a real cost plan, page by page, before you put your name near one.
Get your product into the specification months before anyone goes to tender.
Nepali for a different one. Another way of doing this. The number before the drawings are finished, rather than after.
The bridge between design and build