What it costs

Two services. Start anywhere, stop anywhere.

A fixed fee for the plan. One quoted price per package for the procurement. No day rate, no percentage, no variation for choosing a different product.

Cost plan
Design stage
£1,800extensions and renovations
£3,000new builds
excl. VAT, fixed.
You get
Every element priced against a named product
Every interface studied, every element scheduled
The date each price holds to
Samples and prices for flooring
An hour together on the finished plan
Cost plan +Quoted on the drawings

Adds a survey of the existing structure, or the ground on a new build, so foundations and frame are priced on fact.

Four questions. We reply within two working days.

Procurement
With or without a plan
One pricequoted per package, before you commit
Structure, cladding, glazing and flooring.
Clarity and control
Manufacturer direct, not through a merchant
Your deposit held in a separate client account
The scope split written for your builder
The order chased, from factory to site
No cost plan needed first

Every dimension comes from you or your builder on a sheet you sign. We survey ground and structure, not sizes. We never install.

What actually happens
01
We cost it
Two weeks
Every element measured and priced against a named product, while the drawings can still move.
02
We hold it
Up to 12 months
Every line dated, agreed with the manufacturer who gave it. Where a price cannot be held, we label it open.
03
We buy it
To your programme
Direct from the manufacturer, with the scope split written for your builder.
What we buy, and how long it holds
Structure, SIPS and timber frame
up to 12 months
Cladding and rainscreen
up to 5 months
Glazing, external doors and rooflights
30 to 90 days
Flooring, timber, tile and stone
45 days

Ranges across the manufacturers we buy from today. Your plan names the actual hold on every line. Everything else is priced in your plan, bought by you, and fitted by your builder.

Sample arko cost plan

A 38 m2 single storey rear extension in Edinburgh, priced at stage 3, beside the estimate the same homeowner would normally hold.

A typical estimate
What you hold today
Demolition and groundworkincluded
Structural shellincluded
Roof and rooflightsincluded
Windows and external doorsprov sum
First fix and servicesincluded
Plastering, decoration and finishesincluded
Preliminaries and profitincluded
Total£95,000
What it does not tell you
Which figures are quotes and which are guesses
How long any of it is held for
What happens to the number if the ground is bad
An arko cost plan
RICS element codes, stage 3
ElementFigureState
1 Substructure, strip foundations and ground floor slab£9,480Allowed
2.1 Frame, structural steel, 2 beams and padstones£5,240Priced
2.3 Roof, warm flat deck, covering and 2 rooflights£9,860Allowed
2.5 External walls and cladding, 46 m2£13,320Priced
2.6 Windows and external doors, bifold and 3 units£15,740Priced
2.7 Internal walls, partitions and openings£3,180Allowed
3.1 Wall and ceiling finishes, plaster and decoration£5,920Allowed
3.2 Floor finishes, engineered oak, 38 m2£4,826Priced
5 Services, electrical, heating and drainage£11,450Allowed
7 Works to existing, underpinning, subject to surveyOpen
8 External works, service diversion, subject to SP EnergyOpen
9 Preliminaries, scaffold, welfare and site protection£7,640Allowed
10 Main contractor overheads and profit£5,610Allowed
Priced and allowed£92,266

Priced is a dated quote from a named supplier. Allowed is our judgement from benchmark data. Open is a risk we have found and not yet closed.

Start here.

Not sure which one you need? Send the drawings to info@arko.build and we will tell you. Already hold a quote? Bring it, and we will say honestly if we cannot better it.

The pilot is open. The projects we price now are the ones that shape what this becomes.

Arko Tech Limited. 5 South Charlotte Street, Edinburgh, EH2 4AN. Contact: 0131 212 5858
Registered in Scotland. Company No. SC884278